Been a long 6 mths. But almost there!
Hi, I thought I give an update on our project in Florida panhandle near Pensacola. 10k of SBF in Phase 1. Paving going in this week. A few stats for consideration. - Road frontage 40k ADV - 12X12 garage doors - Phase 1, 10k in two buildings 5k each - Phase 2, 10k Any constructive criticism gladly accepted. This is my first park, made some mistakes, and had some wins!
Been a long 6 mths. But almost there!
1 like • 4d
Will, thats all in but please remember my numbers are lower due to the work we self performed. Growing up farming we had access to some heavy equipment and considerable time in the seat. We self performed clearing, grading and drainage. Actually worked out a deal with a dirt yard to complete our finish grading in exchange for the fill dirt removed. Finish grading takes a very skilled operator, which i am not.
0 likes • 4d
@Aldo Chandra the major expense was not really in the building itself but more the slab. The increased factor required a wind column with a 13x13x4 footer under it. Each steel column required a substantial footer w/rebar and this basically tanked our concrete number. I honestly thing our structural engineer overbuilt the foundations because he was not familiar with the location. But he came packaged with PEMB supplier so it was difficult to communicate directly with the engineer. Lessons learned: 1. Engage your structural directly so that he works for you. 2. Learn about not only wind loads but design factors...they matter alot. I hope that answers your questions.
Curious…How many people watch the call recordings?
The call recordings take time to prepare. Not many people are watching them, so I am considering cutting them. For example, last week’s video only has 20 views. Who is actually watching the calls and are they helpful?
1 like • 8d
I watch them
Septic with Flex?
I've heard mixed opinions on this, but have other developers had success building flex on septic systems? My concern is that it would limit users. However, many of the sites with sewer in my market (Raleigh) have too high of a land basis to pencil. Would love to hear any real-world input. Thanks!
0 likes • 22d
We are actually developing with septic this week in Florida. Due to lack of infrastructure and acreage our septic engineer spec'd a system call Presby. We have 2 systems handling 1200 gal per day each. This is for 10k sf. The system uses far less space than traditional septic. Ive never used this type system so I'll keep everyone posted on how it performs. The systems aren't cheap...about $12k each. But for us that cost penciled bc it allowed us to gain building sf in exchange for smaller drainfield. Here are a few pic from yesterday
For the Developers in the room...
This is a huge debate on our development projects. PEMB vs Tilt vs Wood Frame construction. Which do you prefer and why?
Poll
36 members have voted
1 like • 27d
PEMB is most popular choice in my area.
1-4 of 4
Harvey Daniels
2
2 points to level up
@harvey-daniels-2485
Building my first small bay industrial park in the Florida panhandle.

Active 22h ago
Joined Aug 11, 2026
Powered by